Posts Tagged ‘Stainless Steel’

WORK OF ART COMPLETED LAST NIGHT !

Thursday, May 24th, 2012

WE WOZ AMAZED THAT IT ALL CONNECTED UP PERFECTLY !


The Diskin Ladies nursed the connections together !

The Diskin Ladies nursed the connections together !

Last night at the lake, as the warm sun sank over the west end on perfect Golden Falls glass water, we had a moment to remember !

For weeks and weeks we rattled our brains on how best to construct a second Starting Dock at our Car Park for use while the serious bank erosion problem is tackled over at our Clubhouse area – all with no budget for the work !  What followed was months of designing, welding, constructing, concrete mixing, wood working and tough laboring – all by willing volunteers who gave their free time and money willingly. The final stage eventually arrived last night. Would it all connect correctly with tiny tolerances for the stainless steel bolts, spacers, washers and hinges ? The room for error was about 2.0mm.

Male volunteers like to stay dry !

Male volunteers like to stay dry !

Well, thankfully there was a happy ending to this story. To our own amazement, it all worked perfectly. The first stage of stainless steel walkway is now embedded in concrete on the land-side, the second stage of stainless steel walkway is hinged to both stage one and the new floating dock. The walkway panels also fitted perfectly and even the blue barrels used for flotation did their job – although we may add to these shortly. Finally, the stainless steel anchor lines were connected before we headed home.

The happy sunset moment last night

The happy sunset moment last night

Expecting a few hitches lat night – which never arose, we even had time to sit down and stare at the new creation in the warm sunset – and also do a bit of smiling !

This really was a great Club effort and we would like to thank all who helped along the way. However we have one special person to thank most of all and that is Joe Hearne. Both his time, skill and welding expertise was the secret to this perfect outcome. On behalf of all our Members – A BIG THANK-YOU TO JOE FOR HIS VERY GENEROUS CONTRIBUTION AT OUR TIME OF NEED HERE AT GOLDEN FALLS.



FINAL STAGE OF FUEL JETTY DEVELOPMENT

Wednesday, May 2nd, 2012

BANK HOLIDAY WEEKEND TO SEE COMPLETION OF OUR FUEL JETTY PROJECT


This looked like a minor project when we started. Making safe and extending our Fuel Dock Jetty did not look like a big deal – but it was !

Two part walkway almost ready for launching

Two part walkway almost ready for launching

Firstly, we went the stainless steel route – thanks to Joe Hearne’s welding skills. We learned many years ago that while it may be a bit expensive, it does last more or less forever. The new Jetty walkway has been made in two hinged sections and they are now waiting on the slipway for assembly – see photo.

On goes the lid !

On goes the lid !

Next, we had to repair and extend the old wooden floating dock. Des B-K has the carpentry almost completed. Again, this is in two sections which will be bolted together in the water. The top sheeting will be finished on Friday and then we have to figure out how to move it all to the slipway to insert the barrels. It is a fierce weight and some willing hands will be needed.

More to be poured on the right

More to be poured on the right

On Friday, we are also looking at pouring more concrete to expand the slab laid a few weeks ago as it is just not big enough for the correct placement of the walkway. Getting it done will depend on the water levels. Today, the water was perfect – so lets hope we get lucky again in a few days.

Figs, Simon, Geoff, Sam, Richard, Mark, Joe, Rick and Siggi have all played their part along the way – and now we may even get this job off our backs this weekend. Do drop down as the more hands we have the better.